Law 20/2009 – Environmental license project Annex II

We manage projects for environmental licensing in accordance with Annex II of Law 20/2009. These projects are required to validate compliance with environmental regulations before initiating activities with potential impacts on the environment.

Services in the Law 20/2009 – Environmental license project Annex II

What do we take care of?

9

Preparation of the Technical Project

  • Development of technical reports and environmental studies.
  • Inclusion of all evaluations required by Annex II.
  • Preparation of plans and annexes necessary for the application.
9

Administrative Request Management

9

Environmental Advice

  • Consulting on requirements of Law 20/2009.
  • Guidance in the application of environmental regulations.
  • Resolution of doubts about compliance with requirements.

Law 20/2009 – Draft environmental license Annex II and Engind.

Engine offers a specialized service for the preparation of «Draft Environmental License Annex II» in accordance with Law 20/2009. This service focuses on developing the technical project necessary to obtain the environmental license required for activities classified in Annex II of the regulations. Our goal is to ensure that the project meets all established environmental and legal requirements, making it easier to obtain the license.

The process includes meticulous preparation of the technical documentation that supports the license application, ensuring that all environmental aspects are duly evaluated and complied with. Engine takes care of all the technical and administrative details, providing clients with a comprehensive solution in accordance with current regulations.

Our team of experts works closely with the competent authorities and the client to ensure effective and smooth processing. We are committed to offering clear and precise documentation that supports the environmental license application in a solid and complete manner.

Engineering for Logistics
engineering for logistics
Engineering for Logistics
engineering for logistics
engineering for logistics
Engineering for Logistics

Why count on Engind for Law 20/2009 – Environmental license project Annex II?

Experience

Engind has years of experience in Law 20/2009 – Environmental license project Annex II, with in-depth knowledge and a wide range of skills in this field.

technical excellence

At Engind we strive to maintain a high level of technical excellence in Law 20/2009 – Environmental license project Annex II, ensuring that the latest technologies and methods are used to achieve the best results.

Customer satisfaction

We aim to ensure customer satisfaction, working with you to understand your needs on Law 20/2009 – Environmental license project Annex II ensuring we stay on time and within budget.

Other related services

We prepare preliminary status reports for construction projects, allowing for a detailed assessment of the site and initial conditions. This report is essential for initiating any necessary administrative or licensing procedures, ensuring regulatory compliance.
We offer a responsible food health declaration service, ensuring that companies comply with health and safety standards. We work to ensure that food products are safe and comply with quality and health regulations.
We manage the processing of wastewater discharge permits, both for registration and renewal. This permit is essential to ensure that discharges are carried out in compliance with environmental regulations, protecting water resources and the ecosystem.
We conduct solar quality studies to assess the viability of photovoltaic or solar thermal energy installations. This analysis determines the performance of solar installations and optimizes their design, ensuring efficient use of available solar energy.